Screenshot Frequency per Project and Contract
Screenshot frequency can now be set at the project level and applies as the default for every contract on that project. Contract level frequency remains available, so a specific member can still be tracked at a different rate than the rest of the project.
How It Works
- Set a screenshot frequency directly on the project
- Contracts on that project follow the project setting by default
- Override the frequency on an individual contract when a member needs different settings
Why It Matters
- Monitoring intensity can match the sensitivity of the work rather than the person
- Client projects with stricter requirements are configured once instead of per member
- Fewer settings to maintain as the team on a project changes
Was this helpful?
Thanks for your feedback!