Edit/change tracked time to correct PROJECT if an incorrect project was tracked

2 votes

Would like to be able to change the project tracked (not just task) if an incorrect project was tracked. Need an ability just to edit/change tracked time to correct project.

new

Suggested by: Pixolit (21 May 2020)